Cabin House

What happens when the clients take the design and finish it - ignoring the drawings. Sited on top of a hill it was designed to sit in the ground lower/more protected. Eliminated the center triangle dormer which left it bilateral/static. Finished it with urethane - had to be stripped off within two years. Even still a successful project. Wish the garages didn't look so much like the front door -originally the house was pivoted so you drove around it somewhat to get to the garages. This made it oriented better for beneficial passive gain as well.